A study of the factors related to planned and actual manufacturing lead time in two environments, (1) high-volume continuous-production and (2) job-shop production-to-order
by Jahanguir M. Moghaddam
Availability
Location | Call Number | Availability | Request |
---|---|---|---|
379 N81d no.1660 | Checking availability | Request on-site use | |
Electronic Dissertation | Checking availability |